1.3.1 الأوتاد المحفورة غير المغلفة Augered Uncased Piles Augered Uncased Piles

SBC 303 · Edition 2024 · p. 14

Piles constructed by concrete placement in an unsupported hole either during drilling or after withdrawal of the auger.