العربيةSign inSign up free

1.3.1 Words and terms used in the Soils and Foundations Code (SBC 303) shall have the meanings shown herein (unless the code expressly provides otherwise):

SBC 303 · Edition 2024 · p. 13

Drilled Shaft: A cast-in-place deep foundation element constructed by drilling a hole (with or without permanent casing) into soil or rock and then filling it with fluid concrete.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause

Under this clause

SBC 303 1.3.1: Words and terms used in the Soils and Foundations Code (SBC 303) shall have the meanings shown herein (unless the code expressly provides otherwise): | Emtithal