11.3.3.3 Work with curing water, when it is used, shall be completed before the concrete is exposed to expected freezing temperatures within at least 24 hours.
SBC 302 · Edition 2024 · p. 69
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause