العربيةSign inSign up free

11.3.3.3 Work with curing water, when it is used, shall be completed before the concrete is exposed to expected freezing temperatures within at least 24 hours.

SBC 302 · Edition 2024 · p. 69

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 302 11.3.3.3: Work with curing water, when it is used, shall be completed before the concrete is exposed to expected freezing temperatures within at least 24 hours. | Emtithal