11.3.3 Curing of Concrete
SBC 302 · Edition 2024 · p. 69
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 11.3.3.1 Curing of concrete shall be performed in accordance with the requirements of (Chapter 9, SBC 302).
- 11.3.3.2 Concrete shall be prevented from drying out during the required curing period.
- 11.3.3.3 Work with curing water, when it is used, shall be completed before the concrete is exposed to expected freezing temperatures within at least 24 hours.