العربيةSign inSign up free

1301.4.2 Delivery.

SBC 901 · Edition 2024 · p. 89

The findings of the investigation and evaluation shall be delivered to the building official together with the proposed alternatives as required in Section 1301.4.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause