العربيةSign inSign up free

911.2 Exception

SBC 801 · Edition 2024 · p. 223

Where sufficient exterior wall and roof venting cannot be provided because of inadequate exterior wall or roof area, deflagration venting shall be allowed by specially designed shafts vented to the exterior of the building. 3. Deflagration venting shall be designed…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause