5605 MANUFACTURE, ASSEMBLY AND TESTING OF EXPLOSIVES, EXPLOSIVE MATERIALS AND FIREWORKS
SBC 801 · Edition 2024 · p. 585
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 5605.1 General.
- 5605.2 Emergency planning and preparedness.
- 5605.3 Intraplant separation of operating buildings.
- 5605.4 Separation of manufacturing operating buildings from inhabited buildings, public traffic routes and magazines.
- 5605.5 Buildings and equipment.
- 5605.6 Operations.
- 5605.7 Maintenance.
- 5605.8 Explosive materials testing sites.
- 5605.9 Waste disposal.