العربيةSign inSign up free

3103.6 Construction documents.

SBC 801 · Edition 2024 · p. 445

A detailed site and floor plan for tents or membrane structures with an occupant load of 50 or more shall be provided with each application for approval. The tent or membrane structure floor plan shall indicate details of the means…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause