العربيةSign inSign up free

2404.2 Location of spray-finishing operations.

SBC 801 · Edition 2024 · p. 402

Spray-finishing operations conducted in buildings used for Group A, E, I or R occupancies shall be located in a spray room protected with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 and separated vertically and horizontally from…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause

Under this clause