904.4 Plowing:
SBC 702 · Edition 2024 · p. 45
The site shall be plowed with plows. The site shall also be plowed to a sufficient depth, with the plowing perpendicular to the slope. The sand fill shall be placed immediately after plowing. Pedestrian and vehicular traffic shall be kept…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause