العربيةSign inSign up free

908.1 Where required:

SBC 701 · Edition 2024 · p. 84

A yoke vent shall be installed every ten branch intervals of soil and waste drain pipes in buildings exceeding ten stories, beginning from the uppermost story, in accordance with the requirements of Section 908.1.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 701 908.1: Where required: | Emtithal