905.6 Vent for Future Fixtures:
SBC 701 · Edition 2024 · p. 82
When drain piping is installed for future fixtures, a rough-in for the vent shall be installed. The vent opening shall not be less than one-half the diameter of the rough-in drain to be vented. The vent opening shall connect to…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause