312.6 Building Sewer Tests:
SBC 701 · Edition 2024 · p. 35
The building sewer tests shall be capable of connecting the end of the building sewer at the point of connection with the public sewer. The building sewer shall be filled with water and tested in accordance with the requirements of…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause