306.2.1 Overexcavation:
SBC 701 · Edition 2024 · p. 29
In the event that trenches are excavated to a level lower than the pipe installation level, the trench shall be backfilled to the pipe invert installation level using sand or fine gravel, such that the backfill is placed in layers,…