العربيةSign inSign up free

513.5 Construction of Smoke Barrier:

SBC 501 · Edition 2024 · p. 54

Smoke barriers required for passive smoke control and the smoke control system, using the pressurization method, shall comply with the requirements of Section 709, SBC 201. The maximum allowable leakage area shall be the total area calculated using the leakage…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 501 513.5: Construction of Smoke Barrier: | Emtithal