305.4 Interval of support:
SBC 501 · Edition 2024 · p. 31
Piping shall be supported at intervals not exceeding the intervals specified in (Table 305.4) or in accordance with (ANSI/MSS SP-58).
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause