العربيةSign inSign up free

1109.2 Refrigerant Piping Location:

SBC 501 · Edition 2024 · p. 102

Refrigerant piping shall conform to the installation location requirements of Sections 1109.2.1 through 1109.2.7. Refrigerant piping for refrigerants of Groups A2L and B2L shall also comply with the requirements of Section 1109.3. Refrigerant piping for refrigerants of Groups A2, A3,…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 501 1109.2: Refrigerant Piping Location: | Emtithal