6.5.4 Lateral Force-Resisting System (LFRS) Considerations
SBC 312 · Edition 2024 · p. 103
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 6.5.4.1 It is essential to clearly identify the lateral load paths and the resisting elements, regardless of the system used.
- 6.5.4.2 Flexible connections shall be provided where substantial movement between adjacent components is expected.
- 6.5.4.3 In precast concrete structures, it is important to provide connections that tie all precast concrete components together in the lateral-force-resisting system.
- 6.5.4.4 Since wind and earthquake ground motions occur randomly in one direction, the elements of the structure shall be suitably arranged so that the structure has sufficient strength in any direction.
- 6.5.4.5 To limit the damage to nonstructural components, three options are available to the designer as follows. In general, the first or third approach is accepted for nonstructural concrete wall panels.