العربيةSign inSign up free

4C13 Wind Loads on Buildings for the Main Wind Force Resisting System (MWFRS) (Directional Procedure)

SBC 312 · Edition 2024 · p. 86

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause

Under this clause

SBC 312 4C13: Wind Loads on Buildings for the Main Wind Force Resisting System (MWFRS) (Directional Procedure) | Emtithal