4B4.4.3 Seismic base shear
SBC 312 · Edition 2024 · p. 70
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 4B4.4.3.1 The seismic base shear shall be determined in accordance with the requirements of Section 4B4.4.3.1.
- 4B4.4.3.2 For the purpose of (Section 4B4.4.3.2), a site is permitted to be classified as a rock site if there is not more than 3 m of soil between the rock surface and the bottom of the footing or mat foundation.
- 4B4.4.3.3 (S_DS) and (S_S) shall be calculated in accordance with the requirements of (Section 4B4.1), and shall not exceed 1.5.