العربيةSign inSign up free

5.3.9 Where a structure is located in a flood zone, flood loads and their applicable factors and combinations shall be used in accordance with the requirements of SBC 301.

SBC 311 · Edition 2024 · p. 44

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 311 5.3.9: Where a structure is located in a flood zone, flood loads and their applicable factors and combinations shall be used in accordance with the requirements of SBC 301. | Emtithal