العربيةSign inSign up free

4.2.1 The component manufacturer shall establish and maintain quality control procedures and shall perform inspections to verify that the work conforms to the requirements of (SBC 309) and the shop drawings.

SBC 309 · Edition 2024 · p. 45

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 309 4.2.1: The component manufacturer shall establish and maintain quality control procedures and shall perform inspections to verify that the work conforms to the requirements of (SBC 309) and the shop drawings. | Emtithal