4.1.3 Protected zones
SBC 307 · Edition 2024 · p. 32
The discontinuity specified in Section 9.2.1, resulting from fabrication and erection procedures or from any other causes, shall not be present in a region of the member or of the member connection that is designated a protected zone in accordance…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause