11.1.2.2 Agency Responsible for Prequalification
SBC 307 · Edition 2024 · p. 107
The prequalification of the connection, and the associated prequalification limits, shall be approved by the Connection Prequalification Review Panel (CPRP) approved by the official agency having jurisdiction over construction.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause