14.3.1 Submission of Steel Construction Documents
SBC 306 · Edition 2024 · p. 77
The fabricator and erector shall, prior to fabrication and erection, submit documents for review by the Engineer of Record (EOR) or his designee, in conformance with Section 4.4 of AISC Code of Standard Practice, as applicable. These documents are as…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause