العربيةSign inSign up free

14.1 General Requirements

SBC 306 · Edition 2024 · p. 76

Quality control (QC) requirements contained in this chapter shall be verified by the fabricator and the erector, while quality assurance (QA) shall be verified by other parties —when required— such as the jurisdiction (building official), the applicable building code (SBC…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 306 14.1: General Requirements | Emtithal