9.3.3.3 Beams on Drilled Piers/Caissons
SBC 303 · Edition 2024 · p. 67
The design requirements set forth in Chapter 13, SBC 304 shall be expanded to include, but not be limited to, the requirements set forth in Sections 9.3.3.3.1 and 9.3.3.3.2.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause