5.5.4 Backfill

SBC 303 · Edition 2024 · p. 44

One of the following methods shall be followed for backfilling the voids around a column not embedded in cast footings: 1. Backfill of concrete having a specified compressive strength at 28 days of not less than 15 MPa, such that…