3.8.1
SBC 303 · Edition 2024 · p. 32
The faces of fill and excavation slopes shall be prepared, finished, and maintained to protect against erosion. Grading operations involving a soil volume exceeding 3500 m3 require an approved grading plan prepared by a registered design professional and shall be…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause