العربيةSign inSign up free

3.6.1

SBC 303 · Edition 2024 · p. 31

Excavations around foundations shall be backfilled with soil free of organic materials, construction debris, large stones and rocks, or shall be backfilled with controlled low-strength material (CLSM), provided that the ground surface is prepared to receive the backfill by removing…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 303 3.6.1 | Emtithal