2.5.1 Borings and sampling shall be performed and the equipment used therefor shall conform to generally accepted engineering practice. The registered design professional shall also be fully qualified to work at the site during the boring process and during the sampling process.
SBC 303 · Edition 2024 · p. 29
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause