العربيةSign inSign up free

2.2.3.10 Clear Setback and Clearance Distances

SBC 303 · Edition 2024 · p. 26

The building official is permitted to require a geotechnical investigation by a registered design professional to demonstrate that the requirements for foundation setback distances above a slope or building clearance distances from the base of a slope as provided in…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 303 2.2.3.10: Clear Setback and Clearance Distances | Emtithal