11.3.3.2 Alternative foundation designs subject to the provisions of (Sections 11.1.2) are permitted. The foundation design is not required to comply with the requirements of (Sections 11.3.2 and 11.3.3) in the following cases:
SBC 303 · Edition 2024 · p. 77
- When the soil is removed in accordance with the requirements of (Sections 11.6), or - When the building official approves soil stabilization in accordance with the requirements of (Sections 11.7), or - When the upper portions of the structure…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause