العربيةSign inSign up free

9.3.5.2 Finished surfaces shall be protected from damage caused by construction equipment, methods, or materials, or by the application of curing procedures, or by running water.

SBC 302 · Edition 2024 · p. 59

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 302 9.3.5.2: Finished surfaces shall be protected from damage caused by construction equipment, methods, or materials, or by the application of curing procedures, or by running water. | Emtithal