9.3.4.3 General Testing Requirements: Tests shall be performed to determine the termination time of curing procedures by the engineer/architect in accordance with the requirements of Section 9.3.4.3.
SBC 302 · Edition 2024 · p. 59
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause