9.3.3.6 Absorptive Materials
SBC 302 · Edition 2024 · p. 58
: The requirements given in (Section 9.3.3.6) shall be met for absorptive materials, for their uniform distribution over the concrete surface, for the application of water to the absorptive materials, and for the application of water during the curing period…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause