العربيةSign inSign up free

9.3.2.1 Unformed concrete shall have curing of concrete performed after final finishing by one or more of the curing methods given in (Section 9.3.3) until curing is permitted to be terminated in accordance with the requirements of (Section 9.3.4).

SBC 302 · Edition 2024 · p. 57

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 302 9.3.2.1: Unformed concrete shall have curing of concrete performed after final finishing by one or more of the curing methods given in (Section 9.3.3) until curing is permitted to be terminated in accordance with the requirements of (Section 9.3.4). | Emtithal