العربيةSign inSign up free

9.1.5.2 The contractor shall make the necessary arrangements for materials for curing of concrete and for the procedures for testing and inspecting them at the beginning of the work.

SBC 302 · Edition 2024 · p. 56

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause