9.1.4.4 Submittals shall cover the curing materials specified in (Section 9.1.4.4) where they are identified in the contract or proposed for use by the contractor.
SBC 302 · Edition 2024 · p. 56
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause