9.1.1 Scope
SBC 302 · Edition 2024 · p. 55
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 9.1.1.1 The requirements of (Chapter 9) cover the curing of cast-in-place concrete elements, including the requirements for initial curing, curing of formed surfaces and unformed surfaces, curing time, and protection from mechanical damage.
- 9.1.1.2 The requirements contained in Chapter 9 do not cover special curing of concrete operations such as precast concrete, special construction techniques, or other concrete elements that require the use of special curing procedures.