العربيةSign inSign up free

8.1.4.2 The contractor shall submit the information specified in Sections 8.1.4.2(a) through (e), if required.

SBC 302 · Edition 2024 · p. 51

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause