العربيةSign inSign up free

7.1.5.3 Concrete production and delivery shall conform to the requirements of Sections 7.3.1 and 7.3.2.

SBC 302 · Edition 2024 · p. 46

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 302 7.1.5.3: Concrete production and delivery shall conform to the requirements of Sections 7.3.1 and 7.3.2. | Emtithal