5.3.1 General Requirements for Formwork
SBC 302 · Edition 2024 · p. 38
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 5.3.1.1 Formwork shall be designed, fabricated, erected, supported, braced and maintained so that it is capable of supporting, without collapse, all vertical loads and lateral loads that are anticipated to be applied to it.
- 5.3.1.2 Drawings or plans, including all revisions for the jack layout, temporary construction structures (including shoring equipment), working decks and scaffolds, shall be available at the jobsite.