4.6.1.2 The contractor shall submit the structural analysis requirements and the concrete strength requirements used in planning and executing the removal of formwork and the installation of reshores to the designer and the building official upon request.
SBC 302 · Edition 2024 · p. 34
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause