11.3.1 Preparation Before Casting
SBC 302 · Edition 2024 · p. 68
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 11.3.1.1 All snow, ice, and frost shall be removed from surfaces (if present), including reinforcement, on which concrete placement is to take place.
- 11.3.1.2 Concrete placement around large embedded items identified in the contract documents shall not be permitted unless such embedded items are at a temperature above freezing.