11.1.4 Submittal submitted by the contractor
SBC 302 · Edition 2024 · p. 67
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 11.1.4.1 Concrete mixture proportions shall be submitted by the contractor to the engineer for review and approval.
- 11.1.4.2
- 11.1.4.3 The contractor shall submit detailed procedures for the production, transportation, placement, protection, finishing, curing, and monitoring of concrete temperature during cold weather to the engineer/architect for review and approval.
- 11.1.4.4 The submittal from the contractor shall include procedures to be followed in the event of sudden changes in weather conditions or equipment failures. Casting in cold weather shall not be permitted until these procedures have been reviewed and accepted.