10.3.7.2 Moist curing is recommended for the entire curing period. However, if moist curing cannot be continued beyond three days, the concrete shall be protected from drying out by using heat-reflective plastic sheets, membrane-forming curing compounds, or curing blankets.
SBC 302 · Edition 2024 · p. 65
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause