العربيةSign inSign up free

10.3.4.2

SBC 302 · Edition 2024 · p. 64

Acceptable production methods shall be implemented to reduce the concrete temperature. These include, but are not limited to, storing aggregate stockpiles in the shade, spraying water on stored coarse aggregate stockpiles, using chilled water to produce concrete, and replacing ice…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 302 10.3.4.2 | Emtithal