10.3.3.5 Measurements of air temperature and concrete temperature and measurement of concrete slump shall be performed after initial mixing as required and at the end of the mixing period, in addition to measurement of density and fabrication of strength test specimens.

SBC 302 · Edition 2024 · p. 64