العربيةSign inSign up free

16.1.4 Documentation

SBC 301 · Edition 2024 · p. 125

Prior to performing nonlinear analysis, the project-specific design criteria shall be approved by the structural design reviewers and the authorities having jurisdiction. The project-specific criteria shall also define the items listed in Section 16.1.4.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 301 16.1.4: Documentation | Emtithal